General
LNG production at Shell’s Prelude gas processing plant in Western Australia restarts following 11-month closure
Liquified natural gas (LNG) production has restarted this month on the world’s largest floating object, Shell’s half-kilometre long Prelude gas processing facility.
Key points:
- The facility was shutdown for 11 months after electrical and safety problems
- Some analysts hold concerns about the facility’s economic and environmental performance
- Shell has never revealed the cost of constructing Prelude
The restart is much-needed good news after an 11-month shutdown following a technical issue only described as an “electrical trip” by Shell, and three incidents that the offshore energy regulator NOPSEMA described as “dangerous occurrences”.
Two of those incidents involved “loss of hydrocarbon containment”.
The facility has been moored 400…
-
Noosa News21 hours agoTributes for woman allegedly mowed down on footpath in Maroochydore; Guilherme Dal Bo charged
-
General14 hours agoTwo people arrested after man fatally shot at McLaren Flat
-
General18 hours agoMan refused bail charged with depicting Adolf Hitler and Nazi symbols on boat
-
General7 hours agoThe one tweak that could grow your super by $200,000
