Connect with us

Noosa News

Inside Cross River Rail’s incredible engineering feat

Published

on



Thousands of concrete segments are being meticulously installed inside the $5.4 billion Cross River Rail tunnel as it makes its way under the Brisbane River.The concrete segments, produced out of the Wagners Precast facility at Wacol, are loaded on to two massive tunnel boring machines (TBMs)…



Click here to view the original article.

Continue Reading
Advertisement
Advertisement

Trending