Connect with us

Business

German wind report shows “repowering” wind turbines could double output by 2030 – RenewEconomy

Upgrades to old German turbines could see a massive expansion of output without building in a single new spot

Published

on

post featured image

A new report published by German wind energy industry group Bundesverband WindEnergie (BEW) and regional renewable energy group LEE NRW finds that existing German wind power output could double in output by 2030 purely through upgrades to newer models of wind turbines.
The study, first reported on by German outlet Clean Energy Wire on Thursday, finds that total annual output from German wind power could increase to 200 terawatt hours by 2030 through reporting. This could be up to 500 terawatt hours…

Click here to view the original article.

Continue Reading
Advertisement
Advertisement

Trending