Science
Failed Test Could Further Delay NASA’s Troubled SLS Rocket – Hackaday
The January 16th “Green Run” test of NASA’s Space Launch System (SLS) was intended to be the final milestone before the super heavy-lift booster would be moved…

The January 16th “Green Run” test of NASA’s Space Launch System (SLS) was intended to be the final milestone before the super heavy-lift booster would be moved to Cape Canaveral ahead of its inaugural Artemis I mission in November 2021. The full duration static fire test was designed to simulate a typical launch, with the rocket’s main engines burning for approximately eight minutes at maximum power. But despite a thunderous start start, the vehicle’s onboard systems triggered an automatic abort…
-
Business23 hours ago
Is Warren Buffett’s Berkshire Hathaway the smartest investment you can make today?
-
General24 hours ago
Top chess player Magnus Carlsen forced into draw in historic game against over 134,000 people
-
Noosa News10 hours ago
Commissioner thanks police officer who threw a speed radar at a car
-
General23 hours ago
Taiwan’s President Lai Ching-te calls for peace and dialogue with China while also calling for defence boosts